YALLOURN MINE ALLIANCE
Australia’s second largest open cut mine is adjacent to the Yallourn W Power Station and annually mines around 18 million tonnes of brown coal.
Pro Draft manages the Yallourn Mine onsite drawing office
We provide on-site electrical & mechanical drafting services including; 3D modelling, measuring and technical assistance .
2012 Dredger No. 12 Mid-Life Outage
- Provided 3D Model of redesigned bucket wheel for manufacture
- Prepared detail & arrangement drawings of re-designed bucket wheel drive shaft and associated components to facilitate new adapter sleeve assembly
- Revised drawings for bucket wheel drive gearbox overhaul
- Detailed drawings of new slewing head ball path for manufacture and installation
2011 New Maryvale Coal Field – Conveyor Relocations
- Provided conceptual layouts and arrangements for new conveyors, including relocation and re-use of existing plant
- Revised the 22kV & 6.6kV distribution system drawings
- Provided conceptual and transitional drawings for the re-routing of existing feeders to clear new plant